Inter-Citic Minerals Inc.

Inter-Citic Reports Further Gold Mineralization
Discovered 9 Kilometres West Of The Dachang Main Zone.

Drill hole returns 12.5 metres of 3.34 GPT gold
750 Metres East and along strike from hole CJV-914.

       TORONTO, ON, January 25, 2010 - Inter-Citic Minerals Inc. (TSX: ICI) ("Inter-Citic" or "the Company") President and CEO James Moore, is pleased to report gold mineralization found in an additional exploration drill hole along the major carbonate thrust fault at its Dachang Gold Project in China.
       Exploration hole CJV-923 was drilled along the edge of the major carbonate thrust fault 9 km northwest of the Dachang Main Zone resource area ("DMZ"), and approximately 750 metres to the east of exploration drill hole CJV 914, reported in a press release dated January 11, 2010. The Carbonate Thrust Fault is a dominant fault structure which extends for 18 kilometers across the entire Dachang property. Regionally this east/southeast striking fault is part of the much more extensive regional Gaude Madou Fault structure, and is believed by the Company to be a potentially ideal host for high grade gold mineralization and further discoveries.
       "Exploration hole CJV-923 is definitely in interbedded sediments in the thrust as it was collared 40 meters south of trench TC-4701, which gave us two sulphide results in a thick section of carbonates. Gold in that trench was definitely in altered carbonates. All adjacent holes had visible sulphides in carbonates," said Garth Pierce, VP of Exploration for Inter-Citic.
       "Drill hole CJV-923 ended in mineralized rock and is therefore open to depth," continued Garth Pierce. "Unfortunately, further drilling of this hole had to be abandoned when the drill bit was lost in the hole at only 43 metres depth, and the lateness of the exploration season prevented us from returning to further explore it at depth."
       Detailed drilling results for this hole are set out in a chart posted on the Company's website, www.inter-citic.com
       The Carbonate Thrust Fault structure crosses the Dachang property and this fault zone typically hosts a thick sequence of highly altered carbonate rocks and interbedded sediments which appear to be overthrust on top of the highly deformed pelitic sediments which host the Dachang Main Zone gold mineralization.
       Late in the 2009 field program Inter-Citic drilled six exploration holes along the Carbonate Thrust Fault in the general area of hole CJV-923. The nearest drill section included previously reported hole CJV-914, which returned 21.3 metres of 2.3 GPT gold from a disseminated sulphide intercept in a highly altered carbonate host 750 meters west of hole CJV-923. Other holes in this program intersected disseminated sulfide zones in carbonate rocks in these widely spaced holes and these results will be reported as received.
       A location map showing the location of drill hole CJV-923 in relation to the carbonate fault and the rest of the Dachang property is available on the Company's website at: http://www.inter-citic.com/maps.htm.
       Inter-Citic is conducting multi-element geochemical studies on the mineralized carbonate rock and its associated disseminated sulphides and follow-up metallurgical studies will be conducted separately to determine the appropriate recovery process.

Sample Methodology:

       Drill core samples were taken at geologically significant intervals, typically over one metre. Core recovery was approximately 90%. The designated sample intervals were cut with a diamond saw by qualified technicians. One half of the cut core was selected for assay with the remaining half being placed back into the core box. Care was taken to ensure that neither half of the core represents a bias with respect to the nature and mineral content of the sample. The sample interval and methodology are consistent with industry standards. Drill core samples were shipped to SGS Geochemical Laboratories ("SGS") located in Kunming and Tianjin, China for sample preparation and 50g fire assay with AA finish. SGS is the world's leading inspection, verification, testing and certification company. Analytical work is performed in accordance with recognized standards such as ASTM, ISO, JIS, and other accepted industry standards. Accuracy of the results is tested through the systematic inclusion of reference samples and duplicate samples.
       Security of Samples: All of the samples collected at Dachang are stored in a restricted secure storage area. Samples are shipped by truck to Golmud and delivered to Inter-Citic's courier agent in Golmud for shipment to the various laboratories for analysis. Inter-Citic's courier agents are present at all transshipment points between Golmud and the laboratories. Exploration at Dachang was conducted with the assistance of the numerous professionals from the Qinghai Geological Survey Institute, working in co-operation with Inter-Citic's technical team on site and supervised by Mr. Garth Pierce, Vice-President of Exploration.
       Mr. Gerald Bidwell, P.Geo., the Company's internal Qualified Person under the requirements of National Instrument 43-101, has reviewed the results reported in this press release.
       Mr. B. Terrence Hennessey, P.Geo., of Micon International Limited is a Qualified Person under the requirements of National Instrument 43-101 and has reviewed a copy of this press release.

About Inter-Citic Minerals Inc.

       Toronto-based Inter-Citic Minerals Inc. is an exploration and development company with property in the People's Republic of China, including its Dachang Gold Project in Qinghai Province. Inter-Citic is listed on the TSX under the symbol ICI.
       For further information on Inter-Citic Minerals Inc. contact Stephen Lautens, VP Corporate Communications, at (905) 479-5072 x 227. E-mail: stephen@inter-citic.com or visit the website at www.inter-citic.com.


Special Note Regarding Forward-Looking Statements-Certain statements in Gold Stock News Mining Stocks Updates constitute "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance, or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the following: risks inherent in restrictions of foreign ownership; uncertainties relating to carrying on business in foreign countries; the Company's history of operating losses and uncertainty of future profitability, uncertainty of access to additional capital environmental liability claims and insurance; and dependence on joint venture partners. Certain forward-looking statements will be identified by a cross-reference to the Special Note. Forward-looking statements are typically identified by the words: believe, expect, anticipate, intend, estimate and similar expressions, or which by their nature refer to future events. The Company cautions investors that any forward-looking statements made by the company are not guarantees of future performance, and that the actual results may differ materially from those in the forward-looking statements as a result of various factors, including but not limited to, the Company's ability to be able to continue its substantial projected growth, or be able to fully implement its business strategies, or that management will be able to successfully integrate the operations of its various acquisitions.

GOLD STOCK NEWS
Copyright 2010
| All Rights Reserved
Reproduction in whole or part is strictly prohibited without prior written permission
NOTE: Gold Stock News does not itself endorse or guarantee the accuracy or reliability of information, statements or opinions expressed by any individuals or organizations posted on this site
PLEASE READ DISCLAIMER
Web Site Designed & Maintained by
  
Gemini Communications

  in association with
  
THE BULL & BEAR
INTERNET DIVISION

1-800-336-BULL